The Test, Rod & Rope (TRR) process is a critical step in preparing underground infrastructure for cabling. Unlike many companies that approach it superficially, we excel in thorough and precise execution, at the same time reducing cost for client by avoiding excavations as much as possible.
How do we avoid Civils intervention?
We have many different techniques and a lot of equipment to help us with this, where these fail, we have the knowledge to assess the situation and propose re-routes if possible. We have a lot of equipment such as Duct Rod Rapid ( hydraulic rodding machine ), a lot of different sizes of Cobras for all the various situations encountered on the infrastructure, equipment that goes on the end of the cobra (springs,bullets,ect) to further aid in passing through blockages, rope blowing for very long sections and a lot more.


Cost-cutting through efficient TRR
A poorly executed TRR process can lead to significant cost and delays for the client, a lot of that can be avoided by giving this work to experienced and reliable crews. We use apps and in-house documenting procedures to offer real-time information about your project, at the same time avoiding additional visits, avoiding costly excavation, avoiding delays in building your network.